This hydraulically set, retrievable packer is designed for ESP wells with no movement of the packer relative to the control lines or power cable during setting or retrieving. The packer is made up to the tubing string at a point above the ESP or Artificial Lift system. The packer is made up to the tubing string and run in hole to the setting depth.

An anti-preset function prevents the packer from accidentally setting while running in hole. The packer is set by applying hydraulic pressure against a plugging device in the tubing string below the packer. During setting, the slips and seal elements are forced against the casing wall, anchoring the packer in place and creating a pressure tight seal. Multiple retrieval methods are offered, however once the packer has been released a direct pull on the tubing string allows the seal elements to decompress and the slips to retract. The anti-preset mechanism has an additional function where it locks the packer in the release position, thus preventing it from resetting while pulling out of the hole. This allows the packer to be pushed/pulled without the danger of slips resetting.

Features

ESP completions

Retrievable production annulus pressure barrier

Ties the production tubing to the production casing for zonal isolation

Optional Release features – Pull, Cut, Control Line, Shift Sleeve

Up to 10,000 psi working pressure

Sizes to suit 4-1/2” to 13-3/8” casing

Materials to suit all well environments

Available in multiple configurations

Accepts all types of penetrator systems

Compact design

Single piece mandrel with no leak paths

No movement between tubing/casing during setting

Available with multiple size combinations for casing and tubing sizes

Let’s Get to Work.

That well won’t complete itself. Tell us more about your completions needs and well environment, and we can provide our best recommendations.

Contact Us